The City of Santa Cruz Water Department needed to retrofit the Laguna Creek Dam to move natural sediment past the diversion in order to protect fish species and habitats. Dudek prepared a cultural resources inventory, evaluation, and finding of effect report for incorporation in the environmental impact report, which Dudek also prepared.
Read More
The City of Lomita needed to update its Safety Element to assess the hazards affecting the City of Lomita, when and where hazards are anticipated to occur, who in the city is most vulnerable, and how the City of Lomita is preparing for these hazards. Dudek prepared the Safety Element update, including facilitating public outreach
Read More
Covington Group aimed to develop industrial complexes in Hesperia, California. Facing environmental challenges, including protecting endangered species, Dudek crafted an environmental impact report for the Hesperia Commerce Center, addressing impacts to endangered species, air quality, and traffic. The permits secured set a precedent for desert-area developments, emphasizing conservation in San Bernardino County.
Read More
Nestled in “America’s Salad Bowl,” the City of Gonzales grappled with wastewater compliance challenges related to commercial and industrial land uses. To address this and accommodate industrial expansion, Dudek partnered with major local food processors and the City, providing engineering evaluation and design for an enhanced wastewater collection and treatment system.
Read More
The City of Oxnard’s Tree Program Review provides a road map for the City to plan for the future of its trees. Dudek used a comprehensive approach to address issues associated with deferred maintenance, declining tree health, species diversity, out-of-date City tree policies, and infrastructure conflicts to develop the Tree Program Review.
Read More
In collaboration with SANDAG, Dudek helped develop a Public Works Plan (PWP)/Transportation and Resource Enhancement Program (TREP) for the North Coast Corridor (NCC) in San Diego. The plan, approved in 2014, aims to improve transportation and coastal resources through a $6-billion 40-year program. Dudek’s role included preparing Notices of Impending Development and Coastal Development Permits
Read More
When the Coachella Valley Water District constructed a new headworks at Water Reclamation Plant No. 7 (WRP 7), it was critical to remedy the lack of redundancy and diminishing reliability of the two-decades-old plant sludge thickening and dewatering system. Dudek provided professional engineering services to support the replacement of wastewater solids handling facilities at the
Read More
Dudek was contracted by the Chino Basin Desalter Authority (CDA) to design approximately 1,500 lineal feet of their Product Water Pipeline. The project comprised a new 30-inch-diameter cement-mortar lined and coated (CML&C) welded steel water pipeline and 36-inch DR9 high-density polyethylene (HDPE) pipeline and appurtenances, including a 1,000-lineal-feet horizontal directional drilling (HDD) crossing beneath the
Read More