Potentia-Viridi Battery Energy Storage System

Levy Alameda, LLC is developing the Potentia-Viridi Battery Energy Storage System (BESS), a 400-megawatt energy storage facility in eastern Alameda County, California. Dudek provided environmental and permitting support, technical studies, and agency coordination to help guide the project through California Energy Commission’s (CEC) AB 205 Opt-In Certification Program.

Project Facts
  • Levy Alameda, LLC
  • Alameda County, California
  • First standalone battery storage project approved under the CEC’s AB 205 Opt-In Certification Program
  • 400 megawatts
  • Managed environmental and permitting support, technical studies, and agency coordination

The Challenge

Levy Alameda sought to advance a large-scale BESS Project through the CEC’s AB 205 Opt-In Certification Program. As one of the first standalone battery energy storage projects to pursue approval under the new framework, the project required a strategic approach to navigating an evolving regulatory process with limited precedent. This Project was designed to strengthen grid reliability, reduce reliance on natural gas generation, and meet the state’s evolving energy needs.

The Solution

Dudek’s multidisciplinary team supported environmental review, permitting, technical analyses, stakeholder engagement, and regulatory coordination for the Potentia-Viridi BESS project. Working closely with Levy Alameda, the CEC, and Coffman Engineers, Dudek prepared technical studies, addressed environmental considerations, and helped guide the project through the Opt-In Certification process established under AB 205.

Through proactive coordination and strategic permitting support, Dudek helped advance California’s first standalone battery energy storage projects approved through the accelerated pathway.

The Impact

The Potentia-Viridi BESS expands California’s energy storage capacity, improves system flexibility, and helps advance the state’s transition to a cleaner energy future.

By independently storing electricity and dispatching power during periods of peak demand, the facility will provide critical grid support without being tied to any specific renewable energy source.

What We Did

Our multidisciplinary specialties allow us to provide efficiencies that maintain project momentum.

Next Project

Windy Bluff Energy Storage System

Colorado’s grid is under increasing strain from load growth and a changing energy mix. To support growing energy demand, the proposed Windy Bluff Energy Storage Project in Weld County, Colorado, is a utility-scale battery energy storage system (BESS). The project is expected to deliver up to 125 megawatts, helping maintain reliable service for surrounding communities during periods of high demand. Dudek supported the project with environmental studies and permitting to help secure local approvals.

View Project

Ready to Du More? Find out how we can help achieve your goal!